Sheet Pile Construction
video
Sheet Pile Construction

Sheet Pile Construction

Size:400*100-600*210mm
Wall Thickness:10.5-27.6mm
Length:6m/9m/12m

Description

Product Specification


Size

400*100-600*210mm

Wall Thickness

10.5-27.6mm

Length

6m/9m/12m

Technique

Hot Rolled

Section type

U

Material Grade

GB/T, JIS

Application

pier construction, earth-retaining wall, project, etc.

Package

Standard packaging

Delivery Time

25-30 days for production

Loading Port

Xingang, Tianjin, China

MOQ

3-5 tons



Requirements for installing steel sheet piles

1. The setting position of the steel sheet pile should meet the design requirements, which is convenient for the earthwork construction of the trench foundation, that is, there is room for formwork support and formwork removal outside the most prominent edge of the foundation.

2. The shape of the support plane layout of the grooved steel sheet pile in the foundation pit should be as straight and tidy as possible, and irregular corners should be avoided, to facilitate the utilization and support setting of the standard steel sheet pile. The surrounding dimensions should be combined with the module of the board as much as possible.

3. During the entire foundation construction period, during the construction operations such as excavation, lifting, tying steel bars, and pouring concrete, it is strictly forbidden to collide with the support, to dismantle the support arbitrarily, to cut or weld the support arbitrarily, and to place heavy loads on the support.