Steel Frame Glass Curtain Wall Tube
Size: 20*20-500*500mm or as the requirement,
large size steel tube above 500*500 can be produced.
Thickness: 1.3-40mm or as the requirement
Length: 5.8m/6m/12m or as the requirement
Description
Products Specification:
Size | 20*20*1.0-500*500*16mm or as the requirement, large size steel tube above 500*500 can be produced. |
Thickness | 1.3-40mm or as the requirement |
Length | 5.8m/6m/12m or as the requirement |
Steel grades | Q195,Q235,Q355,Q390,Q550,Q690,Q700 JIS G3466,STKR400,STRK490 ASTM A500,A501,CSA G40.21 50w Class C & Class H EN10219, EN10210,EN10025 We can also produce Indian brands, Chilean brands, Australian brands, and other brands. |
Application | Steel Frame Glass Curtain Wall Heavy steel structure Aerospace engineering High-speed rail Shipbuilding Construction |
Package | in the bundle, or wrapped with waterproof cloth as per the customers' requirement |
Delivery Time | 7-30 days |
Loading Port | Xingang, Tianjin, China |
MOQ | 10 tons |
1. All the pipes are high-frequency welded. 2. Both inner and outer welded stabs can be removed. 3. Pipe can be necked down and punched holes. 4. Supplying BV or SGS Inspection if the client needs it. | |

Construction and installation methods of glass curtain wall:
As an important form of the building facade, the installation and construction method of the glass curtain walls is crucial.
The following will introduce in detail the material preparation, installation steps, construction precautions, etc.
Material preparation:
1. Materials required for glass curtain wall installation include glass plates, aluminum alloy profiles, sealants, etc. Before installation, all materials need to be inspected to ensure that the material quality meets relevant standards.
2. Construction of steel structure: To build the support structure of the glass curtain wall, reinforced concrete or steel structure is mainly used. There are many designs for building brackets, such as parallel wall structures or inclined support structures.
Construction steps:
1. Positioning and installation bracket: According to the design drawings, measure, position, and pour foundation concrete.
2. Install aluminum alloy profiles: According to the design requirements, the aluminum alloy profiles are cut, connected, and fixed according to the shape and size of the supporting structure to complete the construction of the aluminum alloy frame.
3. Install the glass panels: Install the glass panels on the aluminum alloy frame, use professional lifting equipment, and install and adjust them one by one to ensure that the gaps between each glass panel are even and the level and verticality of each glass panel are ensured.
4. Filling of sealant: Fill the junction of the glass plate and the aluminum alloy profile with sealant to ensure that the glass is fixed and waterproof.
5. Cleaning and acceptance: Clean the construction site and conduct final acceptance of the glass curtain wall to ensure that the installation quality meets the requirements.
Construction precautions:
1. Safety first: Strictly abide by safe operating procedures during construction, wear safety protective equipment, and prohibit high-altitude throwing and illegal operations.
2. Material protection: During the construction process, strengthen the protection of glass, aluminum alloy profiles, and other materials to prevent material damage from affecting the installation effect.
3. Quality control: Construction shall be carried out in strict accordance with the design drawings and process requirements to ensure the installation quality of the curtain wall.
4. Environmental protection: Environmental protection work must be done at the construction site to prevent pollution to the surrounding environment.