Tianjin Yuantai Derun Group Demonstrates The Anti-epidemic Power Of Private Enterprises

Tianjin Yuantai Derun Group has overcome many difficulties caused by the new crown epidemic, and mobilized all resources to concentrate on supplying the Qinghai tens of millions of kilowatts*** UHV power new energy base project. At present, all the tenders of the first phase of the project have been supplied. Near the end, it is guaranteed that this major *** project is expected to be fully connected to the grid on September 30 this year as originally planned.


The blue sky, the vast wilderness, and the beautiful Santala in Gonghe County, Hainan Prefecture, Qinghai Province, is building a tens of thousands of kilowatts of new energy base in Hainan. *The 2.2 million kilowatt photovoltaic project built by the Yellow River Hydropower New Energy Construction Branch of Power Investment Corporation is located in the higher altitude of Santala. This project includes three 330kV booster stations and the construction of 44.7 kilometers of 35kV power collection lines. At the construction site of this early 2.2 million kilowatt photovoltaic UHV export supporting project, the construction site was delayed by more than half a month than expected due to the impact of the new crown epidemic. Work was resumed on February 13, 2020, but the current stage of steel pipe The pile project can basically be completed before April 15 as originally planned, which is expected to ensure that the total project will be fully connected to the grid before September 30 this year as originally planned.


September 29, 2019*** Power Investment Corporation, Huanghe Company and their consortium won the bid for the power configuration project of the UHV transmission base in Hainan Prefecture, Qinghai Province. The winning scale reached 4.05 million kilowatts, which is close to the total new energy development capacity of Huanghe Company in the past 10 years. , The total planned investment of the project is 28.6 billion yuan. According to the relevant planning of the *** Development and Reform Commission, the project will achieve full capacity grid connection before September 30, 2020. After strict bidding procedures and on-site review, Tianjin Yuantai Derun Group became a supplier and service provider of the main steel pipe piles for the main project of the project and 135,000 tons of 965,000 structural steel pipes in October 2019. This is Tianjin Yuantai Derun Group has another major contract since the construction of 70,000 tons of structural steel pipe supply service order for the construction of 70,000 tons of structural steel pipes in the "Old Belt New" Egypt "Million Fedan Land Improvement Project" in 2017. Large single order contracts in the past two decades.


On December 16, 2019, the signing ceremony for the capital increase and introduction of the Huanghe Project of *** Power Investment was held at the Beijing Equity Exchange. Huanghe Company, affiliated to *** Power Investment, introduced 8 strong domestic strategic investors through capital increase and share expansion. The raised amount reached 24.2 billion yuan, which provided a solid financial guarantee for the implementation of the "2035 strategy" for the *** Power Investment Corporation-the adjustment of the "comprehensive energy group" to a "clean energy enterprise", which strategically seized the commanding heights of the energy revolution. The raised funds will be used for the construction of 4.05 million kilowatts of new energy projects.


Tianjin Yuantaiderun Group provided the project for the production of steel pipe piles and pipes, the production of flanges and reinforced steel plates, the drilling and cutting processing, the welding processing of semi-finished products such as flanges and reinforced plates, and the amount of zinc added was 85 per square meter. Micron's hot-dip galvanizing and one-stop services such as short-duration and long-distance distribution of goods are equivalent to playing the overall dispatching role in the implementation of the steel pipe pile project of the Yellow River Hydropower Project of Party A, and the responsibility it bears. It is conceivable that this responsibility is also the trust of the owner in the strength of Tianjin Yuantai Derun Group.


With the sudden outbreak of the "new crown epidemic" in 2020, the Chinese government took more than a month with bold determination to basically contain the development of the epidemic. While making major economic sacrifices, it also provided opportunities for earlier resumption of work. This is a battle against the epidemic, and it is also a battle to defend the economy. Since the epidemic has delayed production for nearly a month, in order to ensure that the project can be completed on schedule, while tightening the "battle string", Tianjin Yuantai Derun Group explained its task to the leaders of Tianjin Jinghai District Government and Daqiuzhuang Town Government. With the support of relevant government departments, it became an enterprise to resume work in Jinghai District, Tianjin, and pressed the "Resume button." The domestic company decisively invested nearly 30 million yuan to change many of the original rectangular tube production lines into structural round tube production lines, and changed the hot-dip galvanizing blow-plating production line to the hot-dip galvanizing hanging plating process line, successfully changing the daily production capacity than the normal contract period The design has been improved by 3.5 times, and the logistics and freight units of China Railway and Tianjin-Beijing-Hebei, Shandong, Shanxi and other provinces and cities are contacted externally to ensure the transportation capacity of 60 to 100 vehicles per day.